Structural System
RCC framed structure designed for seismic compliance (Zone-III).
Masonry
AAC block masonry wall.
Pest Control
Anti-termite treatments wherever applicable during the construction stage.
Being integrated modern architecture with top-tier specifications,
DRA Richburg balances elegance with eco-friendly designs.
RCC framed structure designed for seismic compliance (Zone-III).
AAC block masonry wall.
Anti-termite treatments wherever applicable during the construction stage.
Vitrified tile flooring.
Vitrified tile flooring.
Anti-skid ceramic tile flooring.
Anti-skid ceramic tile flooring.
Two coats of putty over one coat primer and Two coats of acrylic emulsion paint.
Two coats of acrylic emulsion over one coat primer.
Weatherproof texture paint or weather proof emulsion paint as decided by the architect.
Ceramic wall tiles up to false ceiling Level.
Glazed ceramic wall tile 2’-0” above the kitchen counter.
Platform with granite counter slab 2’-0” wide.
Stainless steel single bowl sink with drain board and sink faucet.
Provision for chimney, water purifier & washing machine.
Wall mounted European Water Closet (EWC) of Hindware / Parryware or equivalent.
Health faucet, pillar cock, wall mixer, overhead shower of Hindware / Parryware or equivalent.
Grid type false ceiling will be provided.
Pre-engineered veneer finish flush door with architrave, ironmongery like door lock, tower bolt, door viewer, magnetic catcher will be provided.
Pre-engineered flush door.
UPVC sliding windows with necessary hardware will be provided.
UPVC frame and sliding door and necessary hardware will be provided.
UPVC frame with glass louvered ventilation.
Modular railing as per architect design.
Water proofing will be done the water retain areas.
3 Phase connection for each apartment.
350 watts for 2BHK & 500 watts for 3BHK through Automatic Changeover Current & Limiter (ACCL).
RCCB safety device will be provided for each apartment.
Fire Retardant Low Smoke (FRLS) copper wire of a quality ISI brand.
Provision for TV in living and bedrooms with pre-wired co-axial cable for DTH easy connectivity.
Fibre optical cabling in living.
Split air-conditioner provision will be provided living/dining and all the bedrooms.
Geyser provision for all the toilets.
Hydro pneumatic Pressure System.
All internal plumbing line are CPVC.
All external plumbing lines are UPVC / PVC pipes.
All drainage plumbing lines are PVC pipes.
100% power back-up for common areas.
Passenger stretcher lift.
Granite/Panel Cladding at all Levels as per architect design.
Ground floor lobby finished with vitrified flooring with gypsum false ceiling, Vitrified tile as per architect design.
Anti- skid ceramic tile flooring and painting will two coats of acrylic emulsion over one coat primer.
As per architect design.
Granolith cement flooring with car park numbering.
Weathering course with pressed clay tile finishing.
Well defined driveway.
Centralized sewage treatment plant will be provided.
Adequate capacity of centralized water treatment plant will be provided based on water quality.
CCTV surveillance cameras will be provided at entry and exit, lift, stilt lobby, driveway.
Building perimeter fenced by the compound wall for a height as per architect design.
Adequate landscape will be provided as per the landscaping consultant.
Apartment owners name board will be provided in the stilt floor.