Structural System
Raft Foundation with RCC framed structure designed for seismic compliance (Zone-III).
Masonry
AAC block masonry wall.
Pest Control
Anti-termite treatments wherever applicable during the construction stage.
With a commitment to excellence, our projects incorporate top-tier materials
and finishes, delivering lasting value and comfort for every homeowner.
Raft Foundation with RCC framed structure designed for seismic compliance (Zone-III).
AAC block masonry wall.
Anti-termite treatments wherever applicable during the construction stage.
1200mm x 600mm vitrified tile flooring and skirting – (U)
Wooden Finish vitrified tile flooring and skirting – (U)
600mm x 600mm vitrified tile flooring and skirting
600mm x 600mm vitrified tile flooring
3300mm x 300mm vitrified tile flooring
Two coats of acrylic emulsion over one coat primer and two coats of wall putty
Two coats of acrylic emulsion over one coat primer and two coats of putty
Plaster finish with weatherproof texture paint or weatherproof emulsion paint as decided by the architect
300mm x 600mm Glazed vitrified wall tiles up to 7’-0” height
Bare Kitchen
Provision for chimney, water purifier & washing machine
Wall mounted European Water Closet (EWC) of JAQUAR or equivalent. Rimless wall mounted EWC for all the toilets. (The rimless toilet is easier to keep clean, it will stay more hygienic after every flush. The direct flush technique used by most rimless toilets shoots water around the whole of the bowl, which cleans the pan much more effectively than a regular toilet) – (U)
Health faucet, pillar cock, SINGLE LEVER HI-FLOW CONCEALED DIVERTER FOR HOT & COLD MIXER (U), overhead shower of JAQUAR or equivalent
SS square designed gratings will be provided
Grid type false ceiling will be provided above 7’-0” height (easy maintenance of plumbing lines & geysers)
Pre-engineered veneer finish flush door with architrave, Smart biometric door lock Dorma / Dorset or equivalent, ironmongery like door lock, tower bolt, door viewer, magnetic catcher will be provided
Pre-engineered laminate finish flush door with architrave, ironmongery like door lock, tower bolt, magnetic catcher will be provided
Pre-engineered laminated finish shutter doors with ironmongery-like thumb turn lock and a latch will be provided (Front side laminate & all the other side will be of PU finish)
UPVC sliding windows with necessary hardware will be provided
UPVC frame and sliding door with see through glass
UPVC frame with glass louvered ventilation will be provided
MS safety grills will be provided for all the sliding windows inside the apartment
Aluminium system railing with Laminated Toughened Glass as per architect design – (U)
Water proofing will be done @ the water retain area like lift pit, toilet, balcony, UG sump, STP & OHT
3 Phase connection for each apartment
350 watts for 2BHK, 600 watts for 3BHK through Automatic Changeover Current & Limiter (ACCL). (Instead of pre-designed use of electrical light points during power cut flexibility to use the lighting circuit of choice within the allotted power capacity) – (U)
RCCB safety device will be provided for each apartment (protection against short circuit, earth fault as well as any leakage current)
Modular Switches and sockets will be of Panasonic Vision/ L & T or equivalent
Fire Retardant Low Smoke (FRLS) copper wire of a quality ISI brand
Provision for TV in living and master bedroom with pre-wired co-axial cable for DTH easy connectivity
Provision for fibre optical cabling in living
Split air-conditioner provision will be provided living/dining and all the bedrooms. Drain and copper pipe provision for A/C (Easy for fixing your airconditioner without calling technicians to drill the walls)
Exhaust fan provision for all the toilet
Geyser provision for all the toilets
Hydro pneumatic Pressure System (Provides water at constant pressure in all apartments irrespective of the floor vis-à-vis traditional overhead tank) – (U)
All internal plumbing line are CPVC
All external plumbing lines are UPVC / PVC pipes
All drainage plumbing lines are PVC pipes
100% power back-up for common areas
13 passenger stretcher lift KONE / FUJITEC or equivalent
Tiles or panel cladding will be provided
Ground floor lobby finished with vitrified flooring with gypsum false ceiling. All the corridors will be finished with vitrified tile flooring with matching skirting. Painting will be two coats of acrylic emulsion over one coat primer.
Anti- skid ceramic tile flooring and painting will two coats of acrylic emulsion over one coat primer
MS handrail with enamel paint for all the floors
Granolith cement flooring with car park numbering
Weathering course with pressed clay tile finishing
Well defined driveway with interlocking paver block laid all-round the building, demarcation of driveway, convex mirror, driveway lighting, speed breakers for safe turning in driveway
Centralized sewage treatment plant will be provided
Adequate capacity of centralized water treatment plant will be provided based on water quality
CCTV surveillance cameras will be provided at entry and exit, stilt lobby, driveway & All floors lift/staircase lobby
Security cabin will be provided at the entrance
Building perimeter fenced by the compound wall with grand entry gates for a height as per architect / landscape design.
Adequate landscape will be provided as per the landscaping consultant
Apartment owners name board will be provided in the stilt floor
Solar panels will be provided at terrace and connected with bi-direction meter adjusted to common service consumption – (U)